Fibrecoat curing times

Estimated curing times for the Fibrecoat system. Specific onsite conditions including relative humidity in the air and temperature may cause variations with cure times.


Fibrecoat base layer

Curing times are based on 15°C, allowance should be made for additional coverage rates for embedment of the reinforcement fabric at low temperatures.


Fibrecoat second layer

Typical curing times at 15°C